Wilson Engineering Services, PC
Meadville, PA Office
902 Market Street
Meadville, PA 16335
Office: (814) 337-8223
Fax: (814) 333-4342
Email

 

Charlotte, NC Office
11220 Elm Lane
Suite 200
Charlotte, NC 28277
Office: (704) 900-1389
Email

 

 

Links

Active RFPs

PA Fuels for Schools

USDA Forest Service

PA DEP Energy Programs

Biomass Thermal Energy Council

PA Biomass Energy Association

Crawford County Talon Building Heating System

 

 

 

Geothermal Energy - Fort LeBoeuf School District

Project Overview

The project includes installation of a geothermal heating and cooling system as part of a district-wide energy conservation and renewable energy plan.  The geothermal project includes installation of a geothermal well field, two 46-ton ground source heat pumps and a new heating and cooling energy distribution system.  The cost of the project is estimated at $1.3 Million. 

Services Provided

Wilson Engineering Services (WES) provided feasibility level study and cost estimates for this project as well as grant writing and technical consulting services.  The scope of the feasibility study included evaluation of the following:

    • Energy savings or peak load reduction generated by the project;
    • Alternative energy potentially produced by the project.
    • Project readiness;
    • The level to which the project exhibits principals of sound land and water use; and
    • Environmental benefits arising from the project.